Download: RSS | Email Alerts | Podcasts | CBS47 Mobile

Traffic: Jacksonville, FL
Last Update: 12/4/2008 6:20:00 PM

Severity: Construction

Problems: Road construction. Right lane closed
Location: HWY 113/HWY 9A NB between DAMES POINT BRG and DAMES POINT BRG NORTH
Lanes Impacted:
RIGHT LANE OVER THE DAMES POINT BRIDGE CLOSED UNTIL THE SPRING OF 2009 FOR BRIDGE REPAINTING.
Reported on 12/4/2008 6:00:00 PM and Expected to end on 12/5/2008 6:00:00 PM

Problems: Road construction. Right lane closed
Location: HWY 228 EB between ALCOY RD and CHAFFEE RD
Lanes Impacted:
ONE EASTBOUND LANE OF NORMANDY CLOSED BETWEEN NEW WORLD AVENUE AND CHAFFEE ROAD FOR LONG TERM CONSTRUCTION.
Reported on 12/4/2008 6:00:00 PM and Expected to end on 12/5/2008 6:00:00 PM

Problems: Paving operations. Roadway reduced to one lane
Location: STATE HWY A1A Both NB/SB between HWY 105/HECKSCHER DR and LONG POINT DR
Lanes Impacted:
ON-GOING RESURFACING PROJECT ON HECKSCHER DRIVE, BETWEEN THE FERRY SLIP AND THE NASSAU COUNTY LINE.
Reported on 12/4/2008 6:00:23 PM and Expected to end on 12/4/2008 8:00:23 PM

Problems: Road construction. Right lane closed
Location: HWY 113/HWY 9A SB on DAMES POINT BRG
Lanes Impacted:
About 2,600 feet of the right southbound lane near the peak of the bridge is closed until the spring 2008 for the bridge repainting project. This project should be finished in the fall of 2008.
Reported on 12/4/2008 6:00:00 PM and Expected to end on 12/5/2008 6:00:00 PM

Problems: Closed due to road construction
Location: STOCKTON ST None at I 10
Lanes Impacted:
SF: Stockton St. at I-10 will be closed to demolish an overpass.
Reported on 12/4/2008 6:00:00 PM and Expected to end on 12/5/2008 6:00:00 PM

Problems: Road construction. Right lane closed
Location: I 95 SB between DUVAL RD/HWY 102/EXIT 363 and I 295/HWY 9A/EXIT 362
Lanes Impacted:
Reported on 12/4/2008 6:00:00 PM and Expected to end on 12/5/2008 6:00:00 PM

Problems: Long-term road construction
Location: US 17/US 92 Both NB/SB at DOCTORS INLET BRG
Lanes Impacted:
DOCTOR'S INLET BRIDGE WIDENING PROJECT. EXPECTED TO FINISH - WINTER 2010. WATCH FOR LANE CLOSURES AND DELAYS DURING NON-RUSH HOURS.
Reported on 12/4/2008 6:00:00 PM and Expected to end on 12/5/2008 6:00:00 PM